We consulted on our proposed solar park and energy storage facility between 30 June to 1 September 2022. This Statutory Consultation followed an initial consultation with local residents and stakeholders between 22 October and 17 December 2021. The Statutory Consultation included a new Site Layout, that was developed in response to the feedback we received during the first consultation period. A further (targeted) consultation was held between 11 November and 18 December 2022, ahead of submitting our DCO application.
Following the submission of our Development Consent Order (DCO) Application, we ran a further targeted consultation prior to a Change Application being made to the Planning Inspectorate (on behalf of the Secretary of State). As a result of ongoing discussions with National Grid Electricity Transmission plc (NGET), it became clear that additional works at Bicker Fen Substation are required to enable the grid connection. These works lie outside of the current Order Limits at the Bicker Fen Substation, which led to us undertake further consultation. The consultation period closed on 18 August 2023.
To view all of the materials produced for our previous consultations, please click the button below.
A copy of the Order as made by the Secretary of State for Department for Energy Security and Net Zero can be viewed here.
The Secretary of State's Decision Letter can be viewed here.
A copy of the Land Plans can be viewed here.
The Statement of Reasons explaining the compulsory acquisition rights referred to in the Order, can be viewed here.